X-MimeOLE: Produced By Microsoft Exchange V6.5
Received: by onstor-exch02.onstor.net 
	id <01C74CB9.2C982B4E@onstor-exch02.onstor.net>; Fri, 9 Feb 2007 18:14:20 -0800
MIME-Version: 1.0
Content-Type: multipart/alternative;
	boundary="----_=_NextPart_001_01C74CB9.2C982B4E"
Content-class: urn:content-classes:message
Subject: RE: Perforce is going to be shutdown at 6:30 PM this evening - FW: Reminder: Network downtime required - Friday 2/9/2007
Date: Fri, 9 Feb 2007 18:13:31 -0800
Message-ID: <BB375AF679D4A34E9CA8DFA650E2B04E0133639C@onstor-exch02.onstor.net>
X-MS-Has-Attach: 
X-MS-TNEF-Correlator: 
Thread-Topic: Perforce is going to be shutdown at 6:30 PM this evening - FW: Reminder: Network downtime required - Friday 2/9/2007
Thread-Index: AcdMe4BseVdmYXclR4qfZzVpgJhIuAAASk/oAA8ZYl8=
X-Priority: 1
Priority: Urgent
Importance: high
References: <BB375AF679D4A34E9CA8DFA650E2B04E0E7FE2@onstor-exch02.onstor.net> <BB375AF679D4A34E9CA8DFA650E2B04E01336373@onstor-exch02.onstor.net>
From: "Ken Renshaw" <ken.renshaw@onstor.com>
To: "Ken Renshaw" <ken.renshaw@onstor.com>,
	"dl-Engineering" <dl-engineering@onstor.com>
Cc: "Brian Baker" <brian.baker@onstor.com>

This is a multi-part message in MIME format.

------_=_NextPart_001_01C74CB9.2C982B4E
Content-Type: text/plain;
	charset="iso-8859-1"
Content-Transfer-Encoding: quoted-printable

Sorry I'm a few minutes late, but Perforce will be shutdown in another =
15 minutes at 6:30 sharp.=20
=20
I will send out another email when I shut it down, and the last one once =
we're back online.
=20
Thanks,
=20
-Ken

________________________________

From: Ken Renshaw
Sent: Fri 2/9/2007 11:01 AM
To: dl-Engineering
Cc: Brian Baker
Subject: Perforce is going to be shutdown at 6:30 PM this evening - FW: =
Reminder: Network downtime required - Friday 2/9/2007



In light of this network downtime, I will be performing an orderly =
shutdown of the Perforce service and database at 6:30 sharp this =
evening. I will send out a reminder at 6 PM and another just as I'm =
starting to bring everything down. Once the infrastructure is brought =
back online I will restart Perforce and let everyone know it's working =
again.

Thanks all,

-Ken


-----Original Message-----
From: Brian Baker
Sent: Fri 2/9/2007 10:52 AM
To: org-All Employees; dl-Pleasanton; dl-Campbell
Subject: Reminder: Network downtime required - Friday 2/9/2007

Original message sent 2/5/2007 - All information Systems including =
Phones/Servers/Workstations/VPN will be down 7pm - 10pm tonight.



All,



We need to re-cable the server room, and re-layout the power =
distribution from our UPS. All systems will be down during the initial =
phase of the cutover - from Friday 2/9/2007 @ 7PM until Friday 2/9/2007 =
@ 10PM. Critical systems will be back up shortly after the 7PM timeframe =
(VPN, Exchange, etc), however other systems may take longer, and LAN =
users may notice some intermittent connectivity issues through Saturday =
as well (as we will be recabling all ports in the server room).



We have our electricians scheduled to show up Friday night to get new =
power laid out for better power distribution. If you have any questions, =
please let me know, however it is imperative that this happens to ensure =
network stability moving forward.







------_=_NextPart_001_01C74CB9.2C982B4E
Content-Type: text/html;
	charset="iso-8859-1"
Content-Transfer-Encoding: quoted-printable

<HTML dir=3Dltr><HEAD><TITLE>Perforce is going to be shutdown at 6:30 PM =
this evening - FW: Reminder: Network downtime required - Friday =
2/9/2007</TITLE>=0A=
<META http-equiv=3DContent-Type content=3D"text/html; charset=3Dunicode">=0A=
<META content=3D"MSHTML 6.00.2800.1106" name=3DGENERATOR></HEAD>=0A=
<BODY>=0A=
<DIV id=3DidOWAReplyText17674 dir=3Dltr>=0A=
<DIV dir=3Dltr><FONT face=3DArial color=3D#000000 size=3D2>Sorry I'm a =
few minutes late, but Perforce will be shutdown in another 15 minutes at =
6:30 sharp. </FONT></DIV>=0A=
<DIV dir=3Dltr><FONT face=3DArial size=3D2></FONT>&nbsp;</DIV>=0A=
<DIV dir=3Dltr><FONT face=3DArial size=3D2>I will send out another email =
when I shut it down, and the last one once we're back =
online.</FONT></DIV>=0A=
<DIV dir=3Dltr><FONT face=3DArial size=3D2></FONT>&nbsp;</DIV>=0A=
<DIV dir=3Dltr><FONT face=3DArial size=3D2>Thanks,</FONT></DIV>=0A=
<DIV dir=3Dltr><FONT face=3DArial size=3D2></FONT>&nbsp;</DIV>=0A=
<DIV dir=3Dltr><FONT face=3DArial size=3D2>-Ken</FONT></DIV></DIV>=0A=
<DIV dir=3Dltr><BR>=0A=
<HR tabIndex=3D-1>=0A=
<FONT face=3DTahoma size=3D2><B>From:</B> Ken Renshaw<BR><B>Sent:</B> =
Fri 2/9/2007 11:01 AM<BR><B>To:</B> dl-Engineering<BR><B>Cc:</B> Brian =
Baker<BR><B>Subject:</B> Perforce is going to be shutdown at 6:30 PM =
this evening - FW: Reminder: Network downtime required - Friday =
2/9/2007<BR></FONT><BR></DIV>=0A=
<DIV>=0A=
<P><FONT size=3D2>In light of this network downtime, I will be =
performing an orderly shutdown of the Perforce service and database at =
6:30 sharp this evening. I will send out a reminder at 6 PM and another =
just as I'm starting to bring everything down. Once the infrastructure =
is brought back online I will restart Perforce and let everyone know =
it's working again.<BR><BR>Thanks =
all,<BR><BR>-Ken<BR><BR><BR>-----Original Message-----<BR>From: Brian =
Baker<BR>Sent: Fri 2/9/2007 10:52 AM<BR>To: org-All Employees; =
dl-Pleasanton; dl-Campbell<BR>Subject: Reminder: Network downtime =
required - Friday 2/9/2007<BR><BR>Original message sent 2/5/2007 - All =
information Systems including Phones/Servers/Workstations/VPN will be =
down 7pm - 10pm tonight.<BR><BR><BR><BR>All,<BR><BR><BR><BR>We need to =
re-cable the server room, and re-layout the power distribution from our =
UPS. All systems will be down during the initial phase of the cutover - =
from Friday 2/9/2007 @ 7PM until Friday 2/9/2007 @ 10PM. Critical =
systems will be back up shortly after the 7PM timeframe (VPN, Exchange, =
etc), however other systems may take longer, and LAN users may notice =
some intermittent connectivity issues through Saturday as well (as we =
will be recabling all ports in the server room).<BR><BR><BR><BR>We have =
our electricians scheduled to show up Friday night to get new power laid =
out for better power distribution. If you have any questions, please let =
me know, however it is imperative that this happens to ensure network =
stability moving =
forward.<BR><BR><BR><BR><BR></FONT></P></DIV></BODY></HTML>
------_=_NextPart_001_01C74CB9.2C982B4E--
