X-MimeOLE: Produced By Microsoft Exchange V6.5
Received: by onstor-exch02.onstor.net 
	id <01C74C7D.2F23BEC8@onstor-exch02.onstor.net>; Fri, 9 Feb 2007 11:04:54 -0800
MIME-Version: 1.0
Content-Type: multipart/alternative;
	boundary="----_=_NextPart_001_01C74C7D.2F23BEC8"
Content-class: urn:content-classes:message
Subject: Perforce is going to be shutdown at 6:30 PM this evening - FW: Reminder: Network downtime required - Friday 2/9/2007
Date: Fri, 9 Feb 2007 11:01:10 -0800
Message-ID: <BB375AF679D4A34E9CA8DFA650E2B04E01336373@onstor-exch02.onstor.net>
X-MS-Has-Attach: 
X-MS-TNEF-Correlator: 
Thread-Topic: Perforce is going to be shutdown at 6:30 PM this evening - FW: Reminder: Network downtime required - Friday 2/9/2007
Thread-Index: AcdMe4BseVdmYXclR4qfZzVpgJhIuAAASk/o
X-Priority: 1
Priority: Urgent
Importance: high
References: <BB375AF679D4A34E9CA8DFA650E2B04E0E7FE2@onstor-exch02.onstor.net>
From: "Ken Renshaw" <ken.renshaw@onstor.com>
To: "dl-Engineering" <dl-engineering@onstor.com>
Cc: "Brian Baker" <brian.baker@onstor.com>

This is a multi-part message in MIME format.

------_=_NextPart_001_01C74C7D.2F23BEC8
Content-Type: text/plain;
	charset="iso-8859-1"
Content-Transfer-Encoding: quoted-printable

In light of this network downtime, I will be performing an orderly =
shutdown of the Perforce service and database at 6:30 sharp this =
evening. I will send out a reminder at 6 PM and another just as I'm =
starting to bring everything down. Once the infrastructure is brought =
back online I will restart Perforce and let everyone know it's working =
again.

Thanks all,

-Ken


-----Original Message-----
From: Brian Baker
Sent: Fri 2/9/2007 10:52 AM
To: org-All Employees; dl-Pleasanton; dl-Campbell
Subject: Reminder: Network downtime required - Friday 2/9/2007
=20
Original message sent 2/5/2007 - All information Systems including =
Phones/Servers/Workstations/VPN will be down 7pm - 10pm tonight.

=20

All,

=20

We need to re-cable the server room, and re-layout the power =
distribution from our UPS. All systems will be down during the initial =
phase of the cutover - from Friday 2/9/2007 @ 7PM until Friday 2/9/2007 =
@ 10PM. Critical systems will be back up shortly after the 7PM timeframe =
(VPN, Exchange, etc), however other systems may take longer, and LAN =
users may notice some intermittent connectivity issues through Saturday =
as well (as we will be recabling all ports in the server room).

=20

We have our electricians scheduled to show up Friday night to get new =
power laid out for better power distribution. If you have any questions, =
please let me know, however it is imperative that this happens to ensure =
network stability moving forward.

=20



------_=_NextPart_001_01C74C7D.2F23BEC8
Content-Type: text/html;
	charset="iso-8859-1"
Content-Transfer-Encoding: quoted-printable

<!DOCTYPE HTML PUBLIC "-//W3C//DTD HTML 3.2//EN">
<HTML>
<HEAD>
<META HTTP-EQUIV=3D"Content-Type" CONTENT=3D"text/html; =
charset=3Diso-8859-1">
<META NAME=3D"Generator" CONTENT=3D"MS Exchange Server version =
6.5.7650.28">
<TITLE>Perforce is going to be shutdown at 6:30 PM this evening - FW: =
Reminder: Network downtime required - Friday 2/9/2007</TITLE>
</HEAD>
<BODY>
<!-- Converted from text/plain format -->

<P><FONT SIZE=3D2>In light of this network downtime, I will be =
performing an orderly shutdown of the Perforce service and database at =
6:30 sharp this evening. I will send out a reminder at 6 PM and another =
just as I'm starting to bring everything down. Once the infrastructure =
is brought back online I will restart Perforce and let everyone know =
it's working again.<BR>
<BR>
Thanks all,<BR>
<BR>
-Ken<BR>
<BR>
<BR>
-----Original Message-----<BR>
From: Brian Baker<BR>
Sent: Fri 2/9/2007 10:52 AM<BR>
To: org-All Employees; dl-Pleasanton; dl-Campbell<BR>
Subject: Reminder: Network downtime required - Friday 2/9/2007<BR>
<BR>
Original message sent 2/5/2007 - All information Systems including =
Phones/Servers/Workstations/VPN will be down 7pm - 10pm tonight.<BR>
<BR>
<BR>
<BR>
All,<BR>
<BR>
<BR>
<BR>
We need to re-cable the server room, and re-layout the power =
distribution from our UPS. All systems will be down during the initial =
phase of the cutover - from Friday 2/9/2007 @ 7PM until Friday 2/9/2007 =
@ 10PM. Critical systems will be back up shortly after the 7PM timeframe =
(VPN, Exchange, etc), however other systems may take longer, and LAN =
users may notice some intermittent connectivity issues through Saturday =
as well (as we will be recabling all ports in the server room).<BR>
<BR>
<BR>
<BR>
We have our electricians scheduled to show up Friday night to get new =
power laid out for better power distribution. If you have any questions, =
please let me know, however it is imperative that this happens to ensure =
network stability moving forward.<BR>
<BR>
<BR>
<BR>
<BR>
</FONT>
</P>

</BODY>
</HTML>
------_=_NextPart_001_01C74C7D.2F23BEC8--
