X-MimeOLE: Produced By Microsoft Exchange V6.5
Received: by onstor-exch02.onstor.net 
	id <01C72471.A7D23158@onstor-exch02.onstor.net>; Wed, 20 Dec 2006 12:01:36 -0800
MIME-Version: 1.0
Content-Type: multipart/alternative;
	boundary="----_=_NextPart_001_01C72471.A7D23158"
Content-class: urn:content-classes:message
Subject: Clio project meeting minutes
Date: Wed, 20 Dec 2006 12:01:36 -0800
Message-ID: <BB375AF679D4A34E9CA8DFA650E2B04E01CC35A2@onstor-exch02.onstor.net>
X-MS-Has-Attach: 
X-MS-TNEF-Correlator: 
Thread-Topic: Clio project meeting minutes
thread-index: AcckcafGgFQuVRMDRbO6RsekWwKKDg==
From: "Tim Gardner" <tim.gardner@onstor.com>
To: "dl-Clio" <dl-Clio@onstor.com>

This is a multi-part message in MIME format.

------_=_NextPart_001_01C72471.A7D23158
Content-Type: text/plain;
	charset="us-ascii"
Content-Transfer-Encoding: quoted-printable

During the meeting today we discussed the issue of the web-ui help
files.
The decision was made to respin the release to include the help files.
Charissa will verify that HCL has completed all the fixes they are
planning to make.
She will then give Ken the go ahead to spin the release.
QA will test all the help files and links today. Dev will respond to and
fix any problems that are found
QA will also perform a regression test on the web-ui.
The goal is to complete all testing by the end of today so that the
handoff can be made to ops by tomorrow.
Jerry is to check to see if ops plans to work on Friday. If not, then
ops does not need the release until Tuesday.

Sandrine to check with Ken on the status of the R2_1_X_work branch. As
of now the branch is not usable
by dev due to the integration of lambo into the branch. Dev has
requested that the work branch be usable
for development of 2.1 patches.

The Clio TOI and release party will be planned for Friday Jan 5.


------_=_NextPart_001_01C72471.A7D23158
Content-Type: text/html;
	charset="us-ascii"
Content-Transfer-Encoding: quoted-printable

<!DOCTYPE HTML PUBLIC "-//W3C//DTD HTML 3.2//EN">
<HTML>
<HEAD>
<META HTTP-EQUIV=3D"Content-Type" CONTENT=3D"text/html; =
charset=3Dus-ascii">
<META NAME=3D"Generator" CONTENT=3D"MS Exchange Server version =
6.5.7650.28">
<TITLE>Clio project meeting minutes</TITLE>
</HEAD>
<BODY>
<!-- Converted from text/rtf format -->

<P ALIGN=3DLEFT><SPAN LANG=3D"en-us"><FONT SIZE=3D2 =
FACE=3D"Arial">During the meeting today we discussed the issue of the =
web-ui help files.</FONT></SPAN><SPAN LANG=3D"en-us"></SPAN><SPAN =
LANG=3D"en-us"></SPAN></P>

<P ALIGN=3DLEFT><SPAN LANG=3D"en-us"><FONT SIZE=3D2 FACE=3D"Arial">The =
decision was made to respin the release to include =
the</FONT></SPAN><SPAN LANG=3D"en-us"></SPAN><SPAN LANG=3D"en-us"> <FONT =
SIZE=3D2 FACE=3D"Arial">help files.</FONT></SPAN></P>

<P ALIGN=3DLEFT><SPAN LANG=3D"en-us"><FONT SIZE=3D2 =
FACE=3D"Arial">Charissa will verify that HCL has completed all the fixes =
they are planning to make.</FONT></SPAN></P>

<P ALIGN=3DLEFT><SPAN LANG=3D"en-us"><FONT SIZE=3D2 FACE=3D"Arial">She =
will then give Ken the go ahead to spin the release.</FONT></SPAN></P>

<P ALIGN=3DLEFT><SPAN LANG=3D"en-us"><FONT SIZE=3D2 FACE=3D"Arial">QA =
will test all the help files and links today. Dev will respond to and =
fix any problems that are found</FONT></SPAN></P>

<P ALIGN=3DLEFT><SPAN LANG=3D"en-us"><FONT SIZE=3D2 FACE=3D"Arial">QA =
will also perform a regression test on the web-ui.</FONT></SPAN></P>

<P ALIGN=3DLEFT><SPAN LANG=3D"en-us"><FONT SIZE=3D2 FACE=3D"Arial">The =
goal is to complete all testing by the end of today so that the handoff =
can be made to ops by tomorrow.</FONT></SPAN></P>

<P ALIGN=3DLEFT><SPAN LANG=3D"en-us"><FONT SIZE=3D2 FACE=3D"Arial">Jerry =
is to check to see if ops plans to work on Friday. If not, then ops does =
not need the release until Tuesday.</FONT></SPAN></P>

<P ALIGN=3DLEFT><SPAN LANG=3D"en-us"><FONT SIZE=3D2 =
FACE=3D"Arial">Sandrine to check with Ken on the status of the =
R2_1_X_work branch. As of now the branch is not usable</FONT></SPAN></P>

<P ALIGN=3DLEFT><SPAN LANG=3D"en-us"><FONT SIZE=3D2 FACE=3D"Arial">by =
dev due to the integration of lambo into the branch. Dev has requested =
that the work branch be usable</FONT></SPAN></P>

<P ALIGN=3DLEFT><SPAN LANG=3D"en-us"><FONT SIZE=3D2 FACE=3D"Arial">for =
development of 2.1 patches.</FONT></SPAN></P>

<P ALIGN=3DLEFT><SPAN LANG=3D"en-us"><FONT SIZE=3D2 FACE=3D"Arial">The =
Clio TOI and release party will be planned for Friday Jan =
5.</FONT></SPAN></P>

</BODY>
</HTML>
------_=_NextPart_001_01C72471.A7D23158--
