X-MimeOLE: Produced By Microsoft Exchange V6.5
Received: by onstor-exch02.onstor.net 
	id <01C81014.D9117819@onstor-exch02.onstor.net>; Tue, 16 Oct 2007 08:51:50 -0800
MIME-Version: 1.0
Content-Type: multipart/alternative;
	boundary="----_=_NextPart_001_01C81014.D9117819"
Content-class: urn:content-classes:message
Subject: Progress report on Linux system Upgrade
Date: Tue, 16 Oct 2007 08:51:50 -0800
Message-ID: <BB375AF679D4A34E9CA8DFA650E2B04E042EFFDE@onstor-exch02.onstor.net>
X-MS-Has-Attach: 
X-MS-TNEF-Correlator: 
Thread-Topic: Progress report on Linux system Upgrade
Thread-Index: AcgQFNkP3tnzZe8SQ0ykQLUxHO1CKg==
From: "Larry Scheer" <larry.scheer@onstor.com>
To: "Tim Gardner" <tim.gardner@onstor.com>,
	"Andy Sharp" <andy.sharp@onstor.com>
Cc: "Larry Scheer" <larry.scheer@onstor.com>

This is a multi-part message in MIME format.

------_=_NextPart_001_01C81014.D9117819
Content-Type: text/plain;
	charset="iso-8859-1"
Content-Transfer-Encoding: quoted-printable


Based on integral subsystem considerations, the interrelation of system =
technologies
requires considerable systems analysis and trade-off
studies to arrive at the greater fight-worthiness concept. Without going =
into
the technical details, a large proportion of interface coordination
communication maximizes the probability of project success, yet =
minimizes cost
and time required for the anticipated fourth-generation equipment. In =
summary,
the independent functional principle adds explicit performance limits to =
the
subsystem compatibility testing. In theory, the product configuration =
baseline
is further compounded when taking into account the sophisticated =
hardware. It
is assumed that the incorporation of additional mission constraints must
utilize and be functionally interwoven with the preliminary =
qualification
limit. As you can clearly see expectations are being met with utmost =
dedication
to process requirements specified in the PLC phased review plan.

Larry

------_=_NextPart_001_01C81014.D9117819
Content-Type: text/html;
	charset="iso-8859-1"
Content-Transfer-Encoding: quoted-printable

<!DOCTYPE HTML PUBLIC "-//W3C//DTD HTML 3.2//EN">
<HTML>
<HEAD>
<META HTTP-EQUIV=3D"Content-Type" CONTENT=3D"text/html; =
charset=3Diso-8859-1">
<META NAME=3D"Generator" CONTENT=3D"MS Exchange Server version =
6.5.7652.24">
<TITLE>Progress report on Linux system Upgrade</TITLE>
</HEAD>
<BODY>
<!-- Converted from text/plain format -->
<BR>

<P><FONT SIZE=3D2>Based on integral subsystem considerations, the =
interrelation of system technologies<BR>
requires considerable systems analysis and trade-off<BR>
studies to arrive at the greater fight-worthiness concept. Without going =
into<BR>
the technical details, a large proportion of interface coordination<BR>
communication maximizes the probability of project success, yet =
minimizes cost<BR>
and time required for the anticipated fourth-generation equipment. In =
summary,<BR>
the independent functional principle adds explicit performance limits to =
the<BR>
subsystem compatibility testing. In theory, the product configuration =
baseline<BR>
is further compounded when taking into account the sophisticated =
hardware. It<BR>
is assumed that the incorporation of additional mission constraints =
must<BR>
utilize and be functionally interwoven with the preliminary =
qualification<BR>
limit. As you can clearly see expectations are being met with utmost =
dedication<BR>
to process requirements specified in the PLC phased review plan.<BR>
<BR>
Larry</FONT>
</P>

</BODY>
</HTML>
------_=_NextPart_001_01C81014.D9117819--
