Subject: FW: Minutes from 9/20 Zonda Core Team Meeting
Date: Fri, 21 Sep 2007 20:25:05 -0800
Message-ID: <BB375AF679D4A34E9CA8DFA650E2B04E05A25A8C@onstor-exch02.onstor.net>
X-MS-Has-Attach: 
X-MS-TNEF-Correlator: 
Thread-Topic: Minutes from 9/20 Zonda Core Team Meeting
Thread-Index: Acf8su3klLinGVQ4T1qhdNIuZ0WkagAHXfwQ
From: "Brian DeForest" <brian.deforest@onstor.com>
To: "dl-Software" <dl-software@onstor.com>

This is a multi-part message in MIME format.

------_=_NextPart_001_01C7FCD0.8F7F96F5
Content-Type: text/plain;
	charset="us-ascii"
Content-Transfer-Encoding: quoted-printable

I always forget to forward these.   Items of interest are #2, #7 and
#10.

> ______________________________________________=20
> From: 	Andrew LeFebvre =20
> Sent:	Friday, September 21, 2007 5:53 PM
> To:	dl-Zonda Core Team
> Subject:	Minutes from 9/20 Zonda Core Team Meeting
>=20
> All,
>=20
> If you missed yesterday's meeting, then you can see what was presented
> by using the following link:
> <\\mightydog\Program Management\Zonda\Weekly Team
> Meetings\09-2007\09-20-2007\Team Meeting Agenda 9-20-07.ppt>
>=20
> Attendees: Erik, Charissa, Sudheesh, Paul N, Dennis, Ian, Brian M,
> Sandrine, Brian D, Paul H, Jonathan, Joe, Andy
>=20
> Key decisions and actions from the meeting were as follows:
> 1)	Paul H would like to discuss the 50 volume 2-node configuration
> with Erik and Sandrine before the test gets started as they need to
> reach consensus about what should be the number of volumes on the
> other node.
> 2)	Regression testing is planned to be completed Friday 9/21.
> 3)	File system test harness implementation during the Zonda
> timeframe is likely not going to occur due to miscommunication with
> HCL.  Next step is HCL needs to write up a design document, which Ian
> will review.  Ian needs the test harness to implement the stress test,
> so this probably won't be happening either by the time Zonda is
> released.
> 4)	Power on/off is more than 50% complete, but remainder of tests
> are dependant on pending fixes, so testing to continue beyond Zonda.
> 5)	Erik shared failover times, which are longer than called out in
> the PRD.  Paul H explained the agreement with Narayan for the priority
> of this release is simply to get failover to work.  The failover
> duration will be improved in subsequent releases.
> 6)	Brian M shared the status of the partner qualifications.  Some
> good news is that there has been some progress on Xyratex as they have
> provided us with some new code to test.  However, the risk is still
> high for them making it into Zonda.
> 7)	FCS review still on for next Thursday (9/27) at 10 AM.  FCS will
> be on Sunday, 9/30 to give time for the gold master to be created and
> tested.
> 8)	Dennis will post the final version of the release notes Friday
> 9/28 as it is expected that nothing will change between then and
> Sunday.
> 9)	As something new, the release notes will include a list of
> partner qualifications.  Dennis will work with Brian M to figure out
> the best way to document this.
> 10)	TOI will be held next Friday 9/28 at 10 AM.  Andy to invite
> dl-Customer Engineering, dl-se, dl-training, and Frontline Support.
> He will make dl-Engineering optional, but the Core Team must attend.
> 11)	There will be no post mortem review for Zonda as the consensus
> is that the issues are understood and have mostly to do with the
> project being caught up in the management changes and introduction of
> the release train model.
>=20
> Please feel free to reply back to all with this message if you recall
> anything important I may have missed.
>=20
> Regards,
>=20
> Andy
>=20

------_=_NextPart_001_01C7FCD0.8F7F96F5
Content-Type: text/html;
	charset="us-ascii"
Content-Transfer-Encoding: quoted-printable

<!DOCTYPE HTML PUBLIC "-//W3C//DTD HTML 3.2//EN">
<HTML>
<HEAD>
<META HTTP-EQUIV=3D"Content-Type" CONTENT=3D"text/html; =
charset=3Dus-ascii">
<META NAME=3D"Generator" CONTENT=3D"MS Exchange Server version =
6.5.7652.24">
<TITLE>FW: Minutes from 9/20 Zonda Core Team Meeting</TITLE>
</HEAD>
<BODY>
<!-- Converted from text/rtf format -->

<P><FONT COLOR=3D"#0000FF" SIZE=3D2 FACE=3D"Arial">I always forget to =
forward these.&nbsp;&nbsp; Items of interest are #2, #7 and #10.</FONT>
</P>

<P><FONT SIZE=3D1 =
FACE=3D"Tahoma">______________________________________________ </FONT>

<BR><B><FONT SIZE=3D1 FACE=3D"Tahoma">From: &nbsp;</FONT></B> <FONT =
SIZE=3D1 FACE=3D"Tahoma">Andrew LeFebvre&nbsp; </FONT>

<BR><B><FONT SIZE=3D1 FACE=3D"Tahoma">Sent:&nbsp;&nbsp;</FONT></B> <FONT =
SIZE=3D1 FACE=3D"Tahoma">Friday, September 21, 2007 5:53 PM</FONT>

<BR><B><FONT SIZE=3D1 =
FACE=3D"Tahoma">To:&nbsp;&nbsp;&nbsp;&nbsp;</FONT></B> <FONT SIZE=3D1 =
FACE=3D"Tahoma">dl-Zonda Core Team</FONT>

<BR><B><FONT SIZE=3D1 =
FACE=3D"Tahoma">Subject:&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</FONT>=
</B> <FONT SIZE=3D1 FACE=3D"Tahoma">Minutes from 9/20 Zonda Core Team =
Meeting</FONT>
</P>

<P><FONT SIZE=3D2 FACE=3D"Arial">All,</FONT>
</P>

<P><FONT SIZE=3D2 FACE=3D"Arial">If you missed yesterday&#8217;s =
meeting, then you can see what was presented by using the following =
link:</FONT>

<BR><FONT SIZE=3D2 FACE=3D"Arial">&lt;</FONT><A =
HREF=3D"file://\\mightydog\Program Management\Zonda\Weekly Team =
Meetings\09-2007\09-20-2007\Team Meeting Agenda 9-20-07.ppt"><U><FONT =
COLOR=3D"#0000FF" SIZE=3D2 FACE=3D"Arial">\\mightydog\Program =
Management\Zonda\Weekly Team Meetings\09-2007\09-20-2007\Team Meeting =
Agenda 9-20-07.ppt</FONT></U></A><FONT FACE=3D"Times New =
Roman">&gt;</FONT>
</P>

<P><FONT SIZE=3D2 FACE=3D"Arial">Attendees: Erik, Charissa, Sudheesh, =
Paul N, Dennis, Ian, Brian M, Sandrine, Brian D, Paul H, Jonathan, Joe, =
Andy</FONT>
</P>

<P><FONT SIZE=3D2 FACE=3D"Arial">Key decisions and actions from the =
meeting were as follows:</FONT>
<UL>
<OL TYPE=3D1>
<LI><FONT SIZE=3D2 FACE=3D"Arial">Paul H would like to discuss the 50 =
volume 2-node configuration with Erik and Sandrine before the test gets =
started as they need to reach consensus about what should be the number =
of volumes on the other node.</FONT></LI>

<LI><FONT SIZE=3D2 FACE=3D"Arial">Regression testing is planned to be =
completed Friday 9/21.</FONT></LI>

<LI><FONT SIZE=3D2 FACE=3D"Arial">File system test harness =
implementation during the Zonda timeframe is likely not going to occur =
due to miscommunication with HCL.&nbsp; Next step is HCL needs to write =
up a design document, which Ian will review.&nbsp; Ian needs the test =
harness to implement the stress test, so this probably won&#8217;t be =
happening either by the time Zonda is released.</FONT></LI>

<LI><FONT SIZE=3D2 FACE=3D"Arial">Power on/off is more than 50% =
complete, but remainder of tests are dependant on pending fixes, so =
testing to continue beyond Zonda.</FONT></LI>

<LI><FONT SIZE=3D2 FACE=3D"Arial">Erik shared failover times, which are =
longer than called out in the PRD.&nbsp; Paul H explained the agreement =
with Narayan for the priority of this release is simply to get failover =
to work.&nbsp; The failover duration will be improved in subsequent =
releases.</FONT></LI>

<LI><FONT SIZE=3D2 FACE=3D"Arial">Brian M shared the status of the =
partner qualifications.&nbsp; Some good news is that there has been some =
progress on Xyratex as they have provided us with some new code to =
test.&nbsp; However, the risk is still high for them making it into =
Zonda.</FONT></LI>

<LI><FONT SIZE=3D2 FACE=3D"Arial">FCS review still on for next Thursday =
(9/27) at 10 AM.&nbsp; FCS will be on Sunday, 9/30 to give time for the =
gold master to be created and tested.</FONT></LI>

<LI><FONT SIZE=3D2 FACE=3D"Arial">Dennis will post the final version of =
the release notes Friday 9/28 as it is expected that nothing will change =
between then and Sunday.</FONT></LI>

<LI><FONT SIZE=3D2 FACE=3D"Arial">As something new, the release notes =
will include a list of partner qualifications.&nbsp; Dennis will work =
with Brian M to figure out the best way to document this.</FONT></LI>

<LI><FONT SIZE=3D2 FACE=3D"Arial">TOI will be held next Friday 9/28 at =
10 AM.&nbsp; Andy to invite dl-Customer Engineering, dl-se, dl-training, =
and Frontline Support.&nbsp; He will make dl-Engineering optional, but =
the Core Team must attend.</FONT></LI>

<LI><FONT SIZE=3D2 FACE=3D"Arial">There will be no post mortem review =
for Zonda as the consensus is that the issues are understood and have =
mostly to do with the project being caught up in the management changes =
and introduction of the release train model.</FONT></LI>
<BR>
</OL></UL>
<P><FONT SIZE=3D2 FACE=3D"Arial">Please feel free to reply back to all =
with this message if you recall anything important I may have =
missed.</FONT>
</P>

<P><FONT SIZE=3D2 FACE=3D"Arial">Regards,</FONT>
</P>

<P><FONT SIZE=3D2 FACE=3D"Arial">Andy</FONT>