AF:
NF:0
PS:10
SRH:1
SFN:
DSR:
MID:<20080401085603.21d4bf28@ripper.onstor.net>
CFG:
PT:0
S:andy.sharp@onstor.com
RQ:
SSV:onstor-exch02.onstor.net
NSV:
SSH:
R:<sripal.surendiran@onstor.com>,<tim.gardner@onstor.com>,<narain.ramadass@onstor.com>,<larry.scheer@onstor.com>,<sudharsan@onstor.com>
MAID:1
X-Sylpheed-Privacy-System:
X-Sylpheed-Sign:0
SCF:#mh/Mailbox/sent
RMID:#imap/andys@onstor.net@onstor-exch02.onstor.net/INBOX	0	47F1E1FE.1@onstor.com
X-Sylpheed-End-Special-Headers: 1
Date: Tue, 1 Apr 2008 08:56:25 -0700
From: Andrew Sharp <andy.sharp@onstor.com>
To: Sripal <sripal.surendiran@onstor.com>
Cc: Tim Gardner <tim.gardner@onstor.com>, Narain Ramadass
 <narain.ramadass@onstor.com>, Larry Scheer <larry.scheer@onstor.com>,
 Sudharsan Srinivasan <sudharsan@onstor.com>
Subject: Re: Integration of FTI branch into dev
Message-ID: <20080401085625.6ecd147c@ripper.onstor.net>
In-Reply-To: <47F1E1FE.1@onstor.com>
References: <BB375AF679D4A34E9CA8DFA650E2B04E04344C37@onstor-exch02.onstor.net>
	<47F1DBDD.9070905@onstor.com>
	<BB375AF679D4A34E9CA8DFA650E2B04E04344C3A@onstor-exch02.onstor.net>
	<47F1E1FE.1@onstor.com>
Organization: Onstor
X-Mailer: Sylpheed-Claws 2.6.0 (GTK+ 2.8.20; x86_64-pc-linux-gnu)
Mime-Version: 1.0
Content-Type: text/plain; charset=US-ASCII
Content-Transfer-Encoding: 7bit

Both the testing and the features are worth delaying the submittal
a day, in my opinion.

Cheers,

a


On Tue, 01 Apr 2008 12:49:26 +0530 Sripal
<sripal.surendiran@onstor.com> wrote:

> Tim,
> 
> I agree integration would be completed by an hour. I like to test the 
> basic functionality once again after integration which may consume
> some time if I run into unforeseen issues. Most of the testing
> requires system upgrade, reboot and flash install which takes lot of
> time.  I will try to complete integration and testing today. I will
> give you the status by 9 am PST. Based on that you can take decision
> to build submittal on Tuesday or Wednesday.
> 
> -Sripal.
> 
> Tim Gardner wrote:
> > I don't understand why there is risk. Have you not been keeping the 
> > FTI branch synced with the
> > dev branch? How much time do you need to eliminate the risk? I 
> > wouldn't think it would take more
> > than an hour to sync your branch with dev and run some basic tests.
> > Let me know how much time you need. I need to get this work into
> > dev and will delay the Tuesday
> > submittal it I have to.
> >  
> > Tim
> >  
> >
> > ------------------------------------------------------------------------
> > *From:* Sripal Surendiran (HCL)
> > *Sent:* Mon 3/31/2008 11:53 PM
> > *To:* Tim Gardner
> > *Cc:* Narain Ramadass; Larry Scheer; Andy Sharp; Sudharsan
> > Srinivasan *Subject:* Re: Integration of FTI branch into dev
> >
> > Tim,
> >
> > Thanks Tim. I was able to achieve this only because of all your
> > help.
> >
> > I feel there is lot of risk in integrating FTI branch to dev branch 
> > today. I do not have lot of time to test after integration. Please
> > let me know if you want to do it today (before 10am PST)?
> >
> > -Sripal.
> >
> > Tim Gardner wrote:
> >> Sripal,
> >>  
> >> I would like you to integrate your FTI/migration branch into the
> >> dev branch prior to the submittal
> >> scheduled for Tuesday morning. Larry usually starts the build
> >> around 10am pacific time.
> >> Let me know if there will be an issue doing this.
> >>  
> >> Testing has been going well. QA has found and filed a number of 
> >> defects but nothing that will be a
> >> blocker for the integration. Nice work on this project. Andy Sharp
> >> is also quite pleased with the work
> >> you have done. You can continue with the defect fixing using the
> >> dev branch.
> >>  
> >> Tim
> >>  
